First phase of these works undertaken out of hours at weekends comprising the removal of existing partitioned offices, large tea point and installation of new Directors office comprising timber partitioned glazed office and new aluminium framed meeting room and re designed tea point.

Works to reduce sound included 15mm soundbloc board, acoustic insulation below raised access floor and acoustic pads above suspended ceiling.

New flooring, data and power installation.

Second phase comprised stripping out existing Gents WC and Disabled WC. Reconfigured Gents WC to create 2 new cubicles, 1 new urinal and 2 WHBs. Fully retiled walls and floors and fitted new suspended ceiling and new lights.

Disabled WC changed into wet room c/w new shower, pot drain, linear drain to door and fully wall and floor tiled. New MF ceiling, lights and humidity controlled ventilation unit. Glass pivot door shower screen. New lockers bench and hooks.